Padun Sergey Petrovich Head of Division, Design Manage LLC «Innovative Firm SNIIP ATOM» padun_sp@sniip-atom.ruSimulating Operation of Novovoronezh NPP(2 Power Units with Two Disabled Feeding Pumps and without Enabling the Backup Feeding Pump 6/15/2021 2021 - #02 Nuclear power plants Gusev I.N. Kozlovsky M.N. Padun S.P.Using the Unit Simulation Model to Improve Design Solutions and Optimize Process Management 11/19/2020 2020 - #04 Nuclear power plants Statsura D.B. Tuchkov M.Yu. Povarov P.V. Tikhonov A.I. Padun S.P. Vorobyov А.P. Mayorova M.M.System development of intelligent operator support at unit no. 1 of the Novovoronezh NPP-2 9/30/2019 2019 - #03 Nuclear power plants Gusev I.N. Solovyev B.L. Padun S.P. Mayorova M.M.Use of pre-commissioning results to develop, tune and validate the operator intelligent support system at unit № 1 of novovoronezh NPP II 10/02/2017 2017 - #03 Global safety, reliability and diagnostics of nuclear power installations Gusev I.N. Solovyev B.L. Povarov V.P. Kuzhil A.S. Padun S.P.